Vastwin

Styrene glycol equipment transportation project

From:广瀛物流 Posted on:2019-10-16 Belong to:Oil and gas refining


Working hours: November 19, 2018 
Project Location: Taicang, Yushan Pier, Ningbo, Zhejiang 
Equipment specifications: The total number of pieces is 31 pieces, the total weight is 1183124 kg, the most heavy piece is 15660*5400*5400 (mm), 149480 kg. 
Job Description: The Taicang factory car board receives the goods, and the short-term docking to the dock floats on board the ship, and the ship is transported to the Yushan terminal ship board for delivery.